Construction of a wharf

Angola

FONDASOL's International Studies department worked on the construction of a wharf in Angola.
Our teams were entrusted with conducting a G12 preliminary design mission for this project.

Period: July to October 2011

CUSTOMER SECTOR Maritime

OWNER SONAMET REGIONAL ASSET DEVELOPMENT

TYPE OF STRUCTURE Maritime structures, Civil engineering

ENTITIES Fondasol

AGENCIES - SERVICES Fondasol International Studies

The project

The project involved the construction of 500 m long linear wharf divided into 3 tranches, a return wharf and possibly an optional tranche towards the north. 

The entire project was to be built partially out into the sea and was designed as sheet piles with a rear curtain wall.  The wharves and hard standing are designed to allow the construction of oil rigs and their loading onto barges.

Areas of expertise involved

icon Investigation

Investigations

icon Laboratoire Geotechnique

Geotechnical laboratory

icon Ingénierie Géotechnique

Geotechnical engineering

Our areas of expertise

G12 preliminary design mission

Campaign of investigations

  • 32 pressuremeter tests in the sea and on land to depths of 40 m
  • 437 pressuremeter tests and SPTs
  • 26 intact samples taken
  • Laboratory tests with 18 identifications, 2 oedometer tests, 13 shear tests

The mission included:

  • Analysis and synthesis of the geological, hydrogeological and geomechanical context of the site
  • Characteristics of the foundations to be created, reinforcement of the ground
  • Foreseeable settlement 
  • Geotechnical hypotheses to be taken into account to justify the structures
  • Definition of the backfill conditions
  • Particular recommendations for the backfilling with estimation of the settlement and its duration
  • All the geotechnical information necessary to the project

For more information

Main points

soulignement
  • G12 mission
  • Settlement
  • SPT tests
  • Geotechnical laboratory